Plan a whole-house refurbishment

Prioritise condition, necessary repairs and coordinated trade work before choosing individual room finishes.

Design and preparation

Six decisions to make before a survey.

  • Survey and priorities

    List known defects, relevant surveys and proposed changes. Investigate leaks, significant movement and moisture before cosmetic finishes.

  • Structural and external work

    Establish any required professional design, approvals and repair scope for roofs, walls and openings before internal work.

  • Services and room layouts

    Coordinate plumbing, electrical and ventilation requirements with the proposed rooms and specialist trades.

  • Room-by-room sequencing

    Identify dependencies between strip-out, preparation, services, plaster, joinery, fitting and flooring. The actual order depends on the property.

  • Occupancy and access

    Agree whether rooms will remain occupied, access, storage and temporary facilities; discuss protection and disruption.

  • Written scope and changes

    Confirm inclusions, exclusions, product responsibilities and how hidden defects or changes are agreed before work proceeds.

A sensible order to discuss the work.

This is a preliminary planning sequence, not a construction method or confirmed programme. The actual order depends on the existing room and agreed specification.

  1. 01

    Assess and prioritise

    Start with defects, condition, room goals and required professional advice.

  2. 02

    Resolve design and external fabric

    Confirm relevant approvals, structural work and weather-related issues.

  3. 03

    Coordinate the internal programme

    Agree trade sequence, room access, fittings and finishes.

  4. 04

    Review scope and handover

    Check agreed work, records and any outstanding specialist responsibilities.

Prepare your room brief.

Tick the decisions you are ready to discuss. Your choices are temporary and are not submitted or saved. You do not need all six ready to request a survey.

0 of 6 topics ready to discuss

Room preparation topicsDownload the full room checklist (HTML)

These projects are matched by recorded services, not a claim that each case study shows this exact room type.

FAQs

Whole-house renovation renovation questions

Turn your ideas into a brief.

Choose the main trade and add connected services in our Project Planner. Where approvals may apply, check the Planning Portal and obtain suitable professional advice.

Ready To Improve Your Home?

Speak directly with a member of the family-run team.

No call centres, no scripts. Just honest guidance from the people who'll be doing the work.

  • Family-run since 1998
  • Fully insured (£5m public liability)
  • 2-Year Workmanship Guarantee
  • Assure registered · REHAU Authorised · City & Guilds
  • We aim to respond the same working day
Get My Free Quote 01706 299010

Free · No-obligation · Family-run since 1998