
Plan a bathroom or ensuite renovation
Start with the space, drainage, ventilation and daily use, then shortlist sanitaryware, furniture and finishes.
Six decisions to make before a survey.
Room use and accessibility
Consider who uses the room, available space, movement around fittings and any accessibility requirements. An appropriate specialist assessment may be needed.
Bath, shower or both
Compare bathing needs, shower access and layout. Check drainage routes, floor construction and suitable installation requirements before selecting products.
Water and ventilation
Discuss water supply, drainage, extraction and moisture control. Agree any work requiring qualified plumbing or electrical trades.
Walls, floors and wet areas
Check the existing background and select suitable waterproofing and surface systems where required; the specification depends on the installation.
Furniture and storage
Plan vanity units, mirrors and storage around pipe routes, usable space and ease of cleaning.
Keeping facilities available
If this is the only bathroom, discuss temporary arrangements, safe access and likely disruption before agreeing dates.
A sensible order to discuss the work.
This is a preliminary planning sequence, not a construction method or confirmed programme. The actual order depends on the existing room and agreed specification.
- 01
Survey room condition
Assess existing surfaces, services and layout.
- 02
Confirm fittings and specification
Agree compatible products, waterproofing and specialist requirements.
- 03
Coordinate preparation and fitting
Sequence removal, services, backgrounds, surfaces and fittings.
- 04
Handover and care
Check the agreed work and discuss product-specific care and ventilation.
Prepare your room brief.
Tick the decisions you are ready to discuss. Your choices are temporary and are not submitted or saved. You do not need all six ready to request a survey.
0 of 6 topics ready to discuss
Real Alliance work to inform your decisions

Fire-Resistant Plasterboard to Steel Beam — Royton
Existing board around a steel beam replaced with pink fire-resistant plasterboard in Royton ahead of a house sale.

Full Kitchen Renovation — Dated Oak to Modern White Gloss
Complete strip-out and replacement of a dated oak kitchen with handleless white gloss units, a marble-effect splashback and updated flooring.
Also recorded: General Building Work, Bathrooms & Kitchens
These projects are matched by recorded services, not a claim that each case study shows this exact room type.
Bathroom & ensuite renovation questions
Turn your ideas into a brief.
Choose the main trade and add connected services in our Project Planner. Where approvals may apply, check the Planning Portal and obtain suitable professional advice.
Speak directly with a member of the family-run team.
No call centres, no scripts. Just honest guidance from the people who'll be doing the work.
- Family-run since 1998
- Fully insured (£5m public liability)
- 2-Year Workmanship Guarantee
- Assure registered · REHAU Authorised · City & Guilds
- We aim to respond the same working day
